Home | Links | Contact Us | Press | Post a job | Bookmark
Search jobs:
Home Energy & Utilities P3e-MS-Project-Scheduler

 Project Engineer - Mechanical or Electrical.
Job Requirements and Duties include the following: ?  Power Plant and/or Hydro experience is ...


 Geologist
GEOLOGICAL POSITIONS GEOSITE, INC. (www.geosite.us) is a premier provider of hydrocarbon well ...


 I&E Specialist / 03691586
Chevron Corporation is one of the world's leading energy companies. The Chevron portfolio includes ...


 ***SITE SAFETY COORDINATOR**Wind Power
CDI Business Solutions is currently recruiting for our client an innovative OEM for the Power I...


 Facility Inspector / 03691591
Chevron Corporation is one of the world's leading energy companies. The Chevron portfolio includes ...


 Electrical Designer - PDMS/Oil and Gas/Petrochemical 30-45 $/hr
Large Oil and Gas Services company has an immediate need for several Electrical Designers. The ...


 Wind Data Analyst #1024
WIND DATA ANALYST for Renewable Energy Systems Americas, Inc. (RES-Americas), an expanding Wind E...


 Technical Specialist - SAP/Design/Oracle SQL 60-106 K/yr
IMMEDIATE NEED!!! Client located in Eastern Texas has an immediate need for an IT Specialist. A ...


 Consultant - Heavy Oils/Crude/Asphalt 45.67-60.1 $/hr
Leading Independent refinery in the state of Texas is seeking a qualified Process Coordinator - A...


 Planning Engineer - Transmission/Power/Systems 70-80 K/yr
TRANSMISSION PLANNING ENGINEER for an expanding Wind Energy company based in Texas with BSEE, PE or ...


P3e/MS Project Scheduler

P3e/MS Project Scheduler

P3e/MS Project Scheduler   Assignment 9 to 12 months, with possibility of going perm.

Start Early September 2006 
Using Microsoft Project and Primavera P3e create and maintain multiple project schedules by performing daily/weekly updates, identify critical path, tracks overall p...

« Full Description


Apply to this job
Please complete this form below:
Your email:
Name:
Resume:
 
 


Related jobs
  Staff Nuclear Specialist
FirstEnergy Corporation is a diversified energy company headquartered in Akron, Ohio.  A fortune 200 Company, FirstEnergy?s subsidiaries and affiliates are involved ...
  Receiving Clerk
Ferguson is the leading wholesale distributor of heating & cooling components, waterworks products (such as water hydrants and meters) and industrial pipe, valves ...
  Supervisor Region Operations - Line - Penelec - GOE06.016
About the Company FirstEnergy Corp. is a diversified energy company headquartered in Akron, Ohio. A Fortune 200 company, FirstEnergy's subsidiaries and affiliates are ...
  Electric Distribution Dispatcher - MetEd - GOE06.411
About the Company FirstEnergy Corp. is a diversified energy company headquartered in Akron, Ohio. A Fortune 200 company, FirstEnergy's subsidiaries and affiliates are ...
  Instrument Physicist
Primary Purpose of Position: Maintain the Radiation Protection portable and fixed instrumentation in an operable and ready status through ensuring proper calibrations ...
  OPERATIONS MANAGER III
EARTH TECH. Building talent to lead. For more than three decades, Earth Tech professionals have contributed to meaningful public and private infrastructure projects ...
  Instrumentation Designer
Senior Instrumentation Designer This is a contract to direct position in Aiken, SC   POSITION OVERVIEW:   Develops difficult and complex layout and ...
  Senior Gas Asset Representative
SCANA Services, a business unit of SCANA Corporation, has an immediate opening for a Senior Gas Asset Representative in the Gas Supply and Capacity Management department....
  Senior I&C Engineer
Location: Robinson Nuclear Plant, Hartsville, SC The Senior I&C Engineer will be responsible for the design of modifications to the Nuclear Power Plant. These ...
  Senior Electrical / I&C Systems Engineer
Location:  Robinson Nuclear Plant, Hartsville, SC The Electrical / I&C Systems Engineer responsibilities/duties include: --System engineering duties in the E...
0.164

Archive: All jobs - Links - Job Search Engines - Medical Encyclopedia

Copyright (c)2006 Eofhr.org/jobs - All rights reserved