Home | Links | Contact Us | Press | Post a job | Bookmark
Search jobs:
Home Construction, Mining and Trades Project-Scheduler

 ELECTRICAL PROJECT MANAGER, etc.
We are a Philadelphia area electrical contractor looking for an electrical project manager to join ...


 Senior Estimator
Senior estimator with 10 years experience in quantity survey and pricing of all types of Civil and B...


 CONSTRUCTION COST ACCOUNTANT / BUSINESS MANAGER
Are you seeking a growth opportunity within a well-respected rapidly growing company that is a ...


 Cost Engineer
A?Construction client of ours?is looking for a Cost Engineer/Project Controls Specialist with 2 or ...


 Rental Coordinator
Construction RENTAL COORDINATOR Ransome Rents, Cat Rental Store of one of the largest family ...


 Construction Engineering Technician
CONSTRUCTION ENGINEERING TECHNICIAN RESPONSIBILTIES: Qualified candidates will be responsible for ...


 Construction Field Technician 4
Weston Solutions, Inc. (WESTON?), a leading infrastructure redevelopment services firm, has an ...


 Assembly/Machine Operation
QUALIFIED CANDIDATES APPLY IMMEDIATELY We are currently seeking qualified candidates to join ...


 Leading National GC Needs Sr. Superintendent
SENIOR SUPERINTENDENT FOR LEADING NATIONAL GENERAL CONTRACTOR   Location: P...


 Subcontractors
CONTRACTORS   *ATTENTION*   $2000.00 Sign on Bonus   The Nations #1 basement ...


 Project Scheduler

Details
Country: USA
Location: OR Portland
Total applied: 19

Relevant Work Experience: 5+ to 7 Years
Career Level: Experienced (Non-Manager)
Education Level: Bachelor's Degree
Job Type: Employee
Job Status: Full Time

Project Scheduler

PROJECT SCHEDULER

 

Responsible for maintaining Primavera schedules for multiple, simultaneous large projects. Applicant should have a working understanding of utility construction work practices, processes and sequencing and their impact on project scheduling activities.Plan, coordinate, and manage all scheduling and control activities on projects / programs assigned using Primavera enterprise (P3e/c)Interface with project management team and various stakeholders on planning and scheduling related itemsRepresent project team in meetings with project stakeholders as required regarding project performance related to schedule and controlsReport project/program performance data as required Ensure compliance with H&M Project Management Methodology (HMPMM) and associated scheduling and control standards Perform additional assignments as directedTravel 25% - 50% as determined by the project needs

Requirements:5-10 years experience with Primavera or Primavera Enterprise Construction (P3e/c) scheduling software applications4 year BS degree in Construction Management, Engineering or related field with 3+ years of relevant scheduling and controls experience or 5 ? 10 years of related industry experienceProject Management Professional (PMP) certification, formal Project Management foundation coursework, or knowledge and experience in Industry PM MethodsCommunication and interpersonal skills essential when interacting with internal and external project stakeholders

Henkels & McCoy benefits include medical, dental, short term and long term disability, life insurance, 401K/profit sharing, paid holidays and vacations

Pre-employment drug screening is required

If you are interested in this position, please submit your resume to:

Henkels & McCoy Inc

5000 N.E. 148th Ave

P.O. Box 20009

Portland, OR 97294-0009

Fax 503-255-5129

Email- pviggiano@henkels.com

Henkels & McCoy is an equal opportunity employer (M/F/D/V)

- Apply for Project Scheduler

Your email:
Friend email:

Related jobs
  Estimator-Doors, Frames & Hardware
Established NW manufacturer/distributor of commercial doors & hardware seeks experienced estimator. Responsibilities include material take-offs, pricing, ...
  Construction Inspector
OREGON BUILDING CODES DIVISION Structural/Mechanical InspectorConstruction Inspector   Structural/Mechanical Inspectors enforce the State Structural Safety and M...
  Geo Division Manager – Allentown, PA
Geo Division Manager – Allentown , PA   Structural Preservation Systems, a Structural Group Company, is a technology-oriented, forward thinking, rapidly ...
  Supervisor (Epoxy Flooring /Polishing Concrete)
Supervisor (Epoxy Flooring /Polishing Concrete)   A well-established National Commercial/Industrial Flooring Contractor has an immediate opening for an E...
  HVAC/Sheet Metal Estimator
HVAC/Sheet Metal Estimator to estimate all facets of sheet metal ductwork construction. Experienced drafter or designer with sheet metal experience will be considered. ...
  Field Engineer
Field Engineer   Brandenburg Industrial Service Company, the #1 demolition contractor in the United States,  provides dismantling services, environmental ...
  Construction Project Manager - Allentown PA
Seasoned Project Manager Salary: $50K-$80K, outstanding benefits package Location:  Allentown, PA   This highly reputable construction ...
  Construction Manager
ThyssenKrupp Elevator, a subsidiary of an international conglomerate, is an industry leader in the manufacturing, installation and service of elevators, escalators and ...
  Project/Facilities Manager
Job Description: Job Duties: Manage field construction of bank projects including new builds, grand slam renovations, office fit-outs. Also manage the daily maintenance ...
  Project Manager
Reynolds is a trend-setting organization, providing innovative Construction Management services to progressive Owners, Architects, and Engineers throughout PA. PROJE...

Related press releases
MPC divided over interest rate policy
News of a split within the Bank of England's interest rate-setting committee emerged today after Bank minutes revealed that three members voted in favour of cutting rates...
Parents have more effect on pass rates than schools, study finds
Middle-class parents who send their children to independent schools in the hope they will pass more exams may be wasting their money, according to research published yest...
Sir Eddie hints at rate cut
Sir Eddie George, governor of the Bank of England, dropped a broad hint last night that interest rates could be cut in coming months to prevent the turmoil in financial m...
Forget the d-word but still cut rates
Deflation is the word of the moment. Across the developed world, it is trendy to say that almost every nation is at risk of becoming the new Japan, with reflationary poli...
Cut rates or risk deflation - Julius
Interest rates should be cut immediately to protect Britain from the threat of deflation, a former member of the Bank of England's monetary policy committee will warn tod...
High interest rates hurt store cards
Continued high levels of interest are behind the falling popularity of store cards, according to new research. A survey published this week by Mintel found that few peo...
Industry dejected as Bank pegs rates
The Bank of England disappointed investors and industry leaders yesterday when it left interest rates unchanged for the 11th month in a row, despite renewed fears about t...
Standard Life cuts final bonus rates
Standard Life today became the latest life assurance company to announce that it will be slashing final bonus rates for its with-profits policyholders. The mutual life a...
Can lenders change their advertised loan rates?
Q I have a ?2,000 variable rate loan from Cahoot. When I applied for the loan a couple of months ago, the advertised rate was 7%-11%, and I was given the 11% rate. Then C...
IMF opposes rate cuts
The International Monetary Fund last night signalled its opposition to lower interest rates in Britain and warned that the Bank of England would have to push up borrowing...
0.014

Archive: All jobs - Links - Job Search Engines - Medical Encyclopedia

Copyright (c)2006 Eofhr.org/jobs - All rights reserved