Home | Links | Contact Us | Press | Post a job | Bookmark
Search jobs:
Home Energy & Utilities P3e-MS-Project-Scheduler

 Project Engineer - Mechanical or Electrical.
Job Requirements and Duties include the following: ?  Power Plant and/or Hydro experience is ...


 Geologist
GEOLOGICAL POSITIONS GEOSITE, INC. (www.geosite.us) is a premier provider of hydrocarbon well ...


 I&E Specialist / 03691586
Chevron Corporation is one of the world's leading energy companies. The Chevron portfolio includes ...


 ***SITE SAFETY COORDINATOR**Wind Power
CDI Business Solutions is currently recruiting for our client an innovative OEM for the Power I...


 Facility Inspector / 03691591
Chevron Corporation is one of the world's leading energy companies. The Chevron portfolio includes ...


 Electrical Designer - PDMS/Oil and Gas/Petrochemical 30-45 $/hr
Large Oil and Gas Services company has an immediate need for several Electrical Designers. The ...


 Wind Data Analyst #1024
WIND DATA ANALYST for Renewable Energy Systems Americas, Inc. (RES-Americas), an expanding Wind E...


 Technical Specialist - SAP/Design/Oracle SQL 60-106 K/yr
IMMEDIATE NEED!!! Client located in Eastern Texas has an immediate need for an IT Specialist. A ...


 Consultant - Heavy Oils/Crude/Asphalt 45.67-60.1 $/hr
Leading Independent refinery in the state of Texas is seeking a qualified Process Coordinator - A...


 Planning Engineer - Transmission/Power/Systems 70-80 K/yr
TRANSMISSION PLANNING ENGINEER for an expanding Wind Energy company based in Texas with BSEE, PE or ...


 P3e/MS Project Scheduler

Details
Country: USA
Location: PA Madison
Total applied: 20

Relevant Work Experience: 2+ to 5 Years
Career Level: Experienced (Non-Manager)
Education Level: Certification
Job Type: Temporary / Contract / Project
Job Status: Full Time

P3e/MS Project Scheduler

P3e/MS Project Scheduler   Assignment 9 to 12 months, with possibility of going perm.

Start Early September 2006 
Using Microsoft Project and Primavera P3e create and maintain multiple project schedules by performing daily/weekly updates, identify critical path, tracks overall program performance and individual project status.
Reports on schedule variances and makes recommendation for corrective actions.
The Project Scheduler will interface with multiple functional departments to identify and build their projects specific plans, identify progress milestones and key deliverables dependencies among the individual projects and work closely with the Project Manager. Required Skills:
Must be highly proficient using Primavera P3e and Microsoft Project.
Must be able to manage multiple complex project schedules simultaneously and work amicably and effectively with subject matter experts and other technical personnel to resolve scheduling conflict and opportunities.
Must be able to wok independently and in a team environment as the situation requires. Desired Skills:
2 years minimum Outage scheduling experience.

 

Please e-mail WORD resume and cover letter to:

- Apply for P3e/MS Project Scheduler

Your email:
Friend email:

Related jobs
  Staff Nuclear Specialist
FirstEnergy Corporation is a diversified energy company headquartered in Akron, Ohio.  A fortune 200 Company, FirstEnergy?s subsidiaries and affiliates are involved ...
  Receiving Clerk
Ferguson is the leading wholesale distributor of heating & cooling components, waterworks products (such as water hydrants and meters) and industrial pipe, valves ...
  Supervisor Region Operations - Line - Penelec - GOE06.016
About the Company FirstEnergy Corp. is a diversified energy company headquartered in Akron, Ohio. A Fortune 200 company, FirstEnergy's subsidiaries and affiliates are ...
  Electric Distribution Dispatcher - MetEd - GOE06.411
About the Company FirstEnergy Corp. is a diversified energy company headquartered in Akron, Ohio. A Fortune 200 company, FirstEnergy's subsidiaries and affiliates are ...
  Instrument Physicist
Primary Purpose of Position: Maintain the Radiation Protection portable and fixed instrumentation in an operable and ready status through ensuring proper calibrations ...
  OPERATIONS MANAGER III
EARTH TECH. Building talent to lead. For more than three decades, Earth Tech professionals have contributed to meaningful public and private infrastructure projects ...
  Instrumentation Designer
Senior Instrumentation Designer This is a contract to direct position in Aiken, SC   POSITION OVERVIEW:   Develops difficult and complex layout and ...
  Senior Gas Asset Representative
SCANA Services, a business unit of SCANA Corporation, has an immediate opening for a Senior Gas Asset Representative in the Gas Supply and Capacity Management department....
  Senior I&C Engineer
Location: Robinson Nuclear Plant, Hartsville, SC The Senior I&C Engineer will be responsible for the design of modifications to the Nuclear Power Plant. These ...
  Senior Electrical / I&C Systems Engineer
Location:  Robinson Nuclear Plant, Hartsville, SC The Electrical / I&C Systems Engineer responsibilities/duties include: --System engineering duties in the E...

Related press releases
Tax rule may start new brain drain
Next week a band of computer experts will trudge along to the High Court in London to contest a tax rule which they say leaves them paying tax at more than 50p in the ...
Extra money for recruitment and heads leaves unions dissatisfied
Extra money for teacher recruitment, school repairs and additional funds for headteachers to spend as they see fit were announced by the Chancellor in his Budget speech t...
Adverts are unacceptable
Two full-page adverts (March 5) asking if I "find it acceptable" - presumably to fraudulently claim unemployment benefit. What I do find unacceptable is asking people to ...
A well-engineered retirement
Bristol pensioner David Parslow has been investing for income since he retired 12 years ago. A former manager in the aero-engines repair division of Rolls-Royce, he took ...
Insurer 'starving us out
Investors with Equitable Life received another blow last week, when the insurer announced that it was suspending payment of guaranteed bonuses. Equitable has given no c...
Survivors relive last desperate hours as 58 illegal immigrants suffocated around them
The two survivors of the Dover lorry tragedy in which 58 Chinese illegal immigrants died spoke yesterday for the first time of the panic that gripped the 60 people packed...
Have SMS, will travel
Ever been stranded in a foreign city with no taxis to be found? A short message service - shown at the GSM Mobile Congress in Cannes - could mean your ride home is just a...
Banking on a better deal
Housing officers are to become part-time bank managers in a new project to tackle financial exclusion, being launched tomorrow by Treasury economic secretary Melanie John...
How much income tax do I pay?
Income tax is a progressive tax, in other words, the rate rises with the level of income. The personal allowance (£5,035) is tax-free, but income over this figure is...
Blood donors get credits for giving
China's chronic shortage of blood supplies has forced one of its biggest cities to institute a commercial scheme which allows donors to claim "blood credits" if they late...
0.024

Archive: All jobs - Links - Job Search Engines - Medical Encyclopedia

Copyright (c)2006 Eofhr.org/jobs - All rights reserved