Control Technician, Jr. (3 positions) |
| Perform technical and specialized work of a skilled nature in connection with electrical systems; ... |
|
PLANT & SERVICE COMBINATION |
|
PLANT AND SERVICE COMBINATION
Columbia Gas of Ohio, a Leader in the energy ... |
|
Substation Engineer - Substation/SCADA/Protection 70-90 K/yr |
| A client located near Oklahoma City, OK has an opening for a SCADA, Protection and Relay Engineer. T... |
|
Measurement Technician |
| MEASUREMENT TECHNICIAN
Medford, OK
ONEOK, INC. is a diversified energy company involved in the ... |
|
Sr. Project Manager: Pipe, Values, Fittings |
| Wilson, a division of Smith International, offers supply-chain management solutions through ... |
|
Geologist |
| SUMMARY
A Geologist is a journeyman position working under the general supervision of a S... |
|
Data Architect |
| Data Architect Position in Oklahoma City.
POSITION SUMMARY
This position is responsible ... |
|
Landman |
| SUMMARY
Entry-level position, intended to provide basic introduction and training to land, legal ... |
|
Lineman Journeyman - DP |
| Position Duties
Assist in the installation, rearrangement, maintenance, operation, removal and ... |
|
Engineering Services - Network Systems |
| Position Duties
Perform the planning and design of new underground network electrical facilities ... |
|
|
Project Scheduling Supervisor
| Details |
Country: USA
Location: OH Columbus
Total applied: 5
Relevant Work Experience: 10+ to 15 Years
Career Level: Experienced (Non-Manager)
Education Level: Associate Degree
Job Type: Employee
Job Status: Full Time
Job Shift: First Shift (Day)
Salary: From 78,728.00 to 96,445.00 USD per year
|
|
Project Scheduling Supervisor
The Outage & Maintenance Planning Project Scheduling Supervisor reports to the Manager - Project Scheduling and is responsible for the supervision of a scheduling group schedules and tracks activities for the major retrofit projects, as well as new construction.
1. Supports and holds employees accountable for meeting scheduling assignment deadlines.
2. Oversees, reviews and coordinates the scheduling work activities including project schedules development, required staffing, and reporting on projects from a scheduling area.
3. Effectively communicates project details and status reports.
4. Develop fully integrated schedules for the project execution team.
5. Provide guidance, instruction and training to employees to improve departments? deliverables.
6. Coordinate work assignments to match project needs & requests.
7. Develops and maintains partnerships with our internal customers.
Experience Requirements
Education: Associate of Applied Science Degree in a technical related field or equivalent in job experience.
Experience: Ten (10) years experience in one or more of these areas: Electric Utility Maintenance Environment, Supervisor in fossil plant environment, Planner in fossil plant, Scheduler, or Project Control
|
| Related jobs |
|
|
Substation Engineer - Engineer/Substation/Electrical 27.88-39.9 $/hr
IMMEDIATE NEED FOR LONG TERM CONTRACT ASSIGNMENT located in the State of Ohio with a large company has IMMEDIATE NEED for multiple Electrical Engineers with Substation ...
|
|
|
Energy Trader I
*** Note: This notice is being provided as a result of the filing of a permanent alien labor certification application for this job opportunity. Any person ...
|
|
|
I&C Engineer - I&C/DCS/Project 40-52 $/hr
Large utility has immediate need for Senior I&C Project Engineers with BSEE or MSEE and a minimum of 10 years experience with review and/or development of ...
|
|
|
Plant Engineer - Power Generation/Plant 60-80 K/yr
Regional electric energy and utility company is seeking a degreed (ME or EE) Plant Engineer for a direct hire position in southern Ohio. Candidate should have 8+ years ...
|
|
|
Marketing Program Manager
Accent Energy, one of the nation's fastest growing energy marketers, located in Dublin, Ohio, is looking for an individual to fill the new position of Marketing Program M...
|
|
|
Analyst, Financial Performance
POSITION DUTIES: The candidate will be responsible for developing and evaluating financial performance reporting for AEP assets (generation and LSE) bid into RTO?s....
|
|
|
Transmission Dispatcher
Position is located in Columbus, OH.
?
Position Duties:
Responsible for assisting in the following areas: efficient operation of the transmission system; assisting in ...
|
|
|
Senior Electrical Engineer
Applicant will perform electrical activities associated with the support of AEP?s generation fleet. Responsibilities will include taking lead engineering roles in ...
|
|
|
Distribution Dispatcher
Position is located in Groveport. OH.
?
Position Duties:
Responsible for providing assistance with the security and service continuity of the distribution system; ...
|
|
|
Director Transmission Planning
Position is located in Gahanna, OH.
Position Duties:
Responsible for organizing and managing all activities related to assessing the adequacy of AEP's entire ...
|
|
| Related press releases |
Retailers warned over 'exorbitant' cards
Retailers charging "exorbitant" interest rates on their store cards were ordered yesterday to include warnings on statements informing customers they could shop around fo...
|
|
Cash in on tax-free saving
If you're holding money in a savings account and you haven't opened an Isa you should consider doing so, according to financial advisers, but time is running out to use t...
|
|
Should you take a risk with your Isa?
You've decided to make the most of this year's Isa allowance before the tax year comes to an end, but that's just the first of a series of decisions you need to make. Nex...
|
|
An equitable development
Something important happened in Paris last week. Led by France, up to 10 countries agreed to impose a tax on air travel, with the money used to increase spending on overs...
|
|
Gilt trip turns into a curse for the little man
Britain's pension funds have a serious gilt complex and this obsession is taking the shine off these cast-iron investments for smaller investors.
Final salary occupation...
|
|
Their profit, our loss
Everyone has a "bastard bank" story - a gripe about unfair charges, ridiculous interest rates, inaccessible branches, or just a general, rumbling discontent. Research fro...
|
|
PFI hospitals to be rated at just over junk, says credit agency
Foundation trust hospitals are likely to be given the lowest investment-grade credit rating - just above high yield or "junk" status - on money they borrow in the City, a...
|
|
As Spamalot goes on sale, silliness erupts
The fellow clutching a placard advertising an internet cafe ("cheap rates for international phone calls") at Cambridge Circus in London yesterday may have felt a little c...
|
|
Cities need tax-raising mayors, says thinktank
Britain's two biggest regional cities should be given elected "super mayors" with tax-raising powers, Labour's favourite thinktank suggested today.
Birmingham and Manche...
|
|
Loan shark who targeted women is jailed for two years
A violent loan shark who grabbed a heavily pregnant woman round the throat and threatened to beat clients up and burn down their homes was jailed for two years yesterday ...
|
|
|
|